skip to main content
Sign in
Subscribe
Topics
The Big Story
Election 2020
Artificial Intelligence
Biotechnology
Blockchain
Climate Change
Computing
Humans and Technology
Tech Policy
Silicon Valley
Smart Cities
Space
Magazine
Read the latest issue
Read previous issues
Subscribe to the magazine
Manage your subscription
MIT News
Special interest publications
Newsletters
Coronavirus Tech Report
Daily Briefing
Artificial Intelligence
Future Economy
Space
Weekend Reads
View all newsletters
Events
EmTech
EmTech Digital
EmTech Next
Future Compute
CyberSecure
View events video
View all events
Search + Menu
Sign in
Subscribe
Topics
The Big Story
Election 2020
Artificial Intelligence
Biotechnology
Blockchain
Climate Change
Computing
Humans and Technology
Tech Policy
Silicon Valley
Smart Cities
Space
Magazine
Read the latest issue
Read previous issues
Subscribe to the magazine
Manage your subscription
MIT News
Special interest publications
Newsletters
Coronavirus Tech Report
Daily Briefing
Artificial Intelligence
Future Economy
Space
Weekend Reads
View all newsletters
Events
EmTech
EmTech Digital
EmTech Next
Future Compute
CyberSecure
View events video
View all events
Lists
10 Breakthrough Technologies
35 Innovators Under 35
50 Smartest Companies
More
Business Lab podcast
Deep Tech podcast
Custom content
Breakthrough-to-Impact
Company
About us
Advertise with us
Careers
Insights
International editions
Policies
Editorial guidelines
Terms of service
Privacy
Cookie statement
Licensing and syndication
Account and Support
Help and FAQ
Contact us
Sign in / Create an account
Manage your account
Follow
Intelligent Machines
A Composite Commercial Jet Takes Wing
Boeing’s much delayed 787 provides lessons on the limits of outsourcing. But it is also a preview of the future of air travel.
by
David Talbot
Feb 23, 2010
In 2006, the first 787 Dreamliner demonstration wing box was ready to be tested at Boeing’s developmental center in Seattle. Boeing would use the wing box to demonstrate the structural integrity of the design, gather data for certification, and validate the repair methods developed specifically for the materials being used on the 787. Problems would later emerge in these structures.
Final assembly for the Dreamliner was one step closer with the arrival in April 2007 of the horizontal stabilizer, delivered in May 2007 via the Dreamlifter, a specially modified 747-400 shown here. The stabilizer, manufactured in Italy, was transported in five pieces. The completed assembly had a wingspan of approximately 62 feet and measured 32 feet from fore to aft.
The Dreamliner’s 98-foot composite wings, manufactured by Mitsubishi Heavy Industries in Japan, were delivered in May 2007 via the Dreamlifter.
Final assembly continued on the 787 Dreamliner in June 2007 with the installation of the wings at Boeing’s factory in Everett, WA, where all the major body parts of the plane were joined together.
The forward nose section was manufactured by Spirit AeroSystems in Wichita, KS. The large white cap that finishes off the Dreamliner’s nose is called the “radome.”
The horizontal stabilizers are attached to the tailcone, with the vertical fin visible in the background.
In November 2008, Boeing completed destructive testing on a full-scale composite wing box of the 787 Dreamliner. To meet certification requirements, the wings need to withstand loads of up to 150 percent of the highest aerodynamic load that the jet could ever be expected to encounter.
The final test occurred in April 2009, when the wing and trailing edges of the static test airframe were subjected to their limit load–the highest loads expected to be seen in service. The load was roughly equivalent to 2.5 times the force of gravity. Boeing would discover unexpected delamination of composite materials at the junction of the wings to the plane’s center wingbox structure, requiring costly retrofits.
Following discovery of the structural problems, Boeing designed titanium reinforcements. Workers finished installing these reinforcements within the side-of-body section of this airplane in November 2009.
Six airplanes are included in the flight-test fleet, which will log more than 3,000 hours of flying time prior to certification. These first few planes will likely be heavier than initially planned, because of the required reinforcements.
Author
David Talbot
Popular
01.
How the nature of cause and effect will determine the future of quantum technology
From our advertisers
In association with
Intel
Getting smart about the future of AI
Intel
Autonomous driving: Safety first
Produced in association with
IBM
Optimizing the engineering life cycle requires digital transformation
Advertisement
Topics
The Big Story
Election 2020
Artificial Intelligence
Biotechnology
Blockchain
Climate Change
Computing
Humans and Technology
Tech Policy
Silicon Valley
Smart Cities
Space
Follow
Subscribe